Enhancement of Lighting at UAE-WD and Core Zoo- Phase 1

Project Code

T-05/2018

Category

Construction

Client

Al Ain Zoo

Consultant

Gulf Contractors

Project Value

1,150,700.00 AED

Execution Period

9/1/2018 To 1/31/2019

Location

Al Ain

Features

Removal and Reinstallation of Lighting in Park. The Scope of work is to enhance the lights in the UAE WD and its connection with the core zoo. 
• The existing 1 m Bollard lights shall be removed, cleaned and handed over to FM stores, new pole lights same or equivalent to the lights installed in the world desert project shall replace the removed bollard lights.
• The old foundations shall be removed and new foundations based on the manufacturer recommendations to be constructed at site in the same location of the old foundation including all necessary civil works.

• The new pole lights shall be installed on the new foundation as per the manufacturer recommendations and international standards. 
• All electrical connection to be executed using the same power network and connecting cables and provide any necessary connection or panel to guarantee the connectivity and functionality of the system. 

From The Gallery

About Us

GCC, founded in the year 1988, is a name synonymous with innovation and excellence in construction. Our success is exemplified by the sheer breadth of projects accomplished, spanning a wide spectrum right from infrastructure, defense and leisure to industrial, commercial and residential. 

Latest News

  • Gcc is award a big new project at Al Raha beach east development public realm and pedestrian bridges construction works

    + Read more

  • Plantation Week 2014

    + Read more

Contact Us

Copyright © 2015. All rights reserved.